|
 |
The Master Plan |
 |
|
 |
These are the phases of the Master Plan for new Airport Terminal and development of the Airport grounds and facility. Development can take place without disturbance of the existing airport operation. Airport land is fully utilized and well planned for future expansions as needed. Roads and tunnels are planned to ensure the smoothness of traffic and security.
|
| |
| Phase 1 - Package 421 |
Phase 1 - Package 422 |
Aerial Shot of the Progress |
|
| |
|
|
|
| |
|
|
|
|
 |
Phase 1 | Phase 2 | Phase 3 | The Existing Airport |
| |
|
 |
|