Twitter pageVisit our Facebook pageVisit our YouTUBELinkedIn page

The Master Plan
 
These are the phases of the Master Plan for new Airport Terminal and development of the Airport grounds and facility. Development can take place without disturbance of the existing airport operation. Airport land is fully utilized and well planned for future expansions as needed. Roads and tunnels are planned to ensure the smoothness of traffic and security.
 
Phase 1 - Package 421 Phase 1 - Package 422 Aerial Shot of the Progress  
 
       
Phase 1 | Phase 2 | Phase 3 | The Existing Airport